INTRO
Project type: Extra large project
A historical monument, symbolizing the communist regime in Bulgaria, is designed to be a concert venue. The building is located on top of the mountain. It is been abounded ever since 1989 when the communist regime went down.
The bad situation reflected on the people’s mind and led to a total disrespect of the monument. The building has been vandalised and ruined daily.
Including symbols from a very old Bulgarian tradition and innovative geometrical interior construction, the project is targeted at giving rise to dynamic feelings in its visitors and presenting them with an unforgettable experience – musical and visual one.
Location plan of the building
Elevation Plans
Floor plans
Cross-section Plan
Renders
The Model
The model has won an award for the best model at Coventry University ID Degree Show 2017.
The Model is made out of plywood with a thickness 4 mm. The tower contains 175 pieces of plywood, drawn on Adobe Illustrator and laser-cutted.